638 Views
Operations: Improving the Front of the Plant
SWRCB Wastewater: 0.1 CEU
CWEA: 1 Contact Hour
Practice Area: Engineering & Research, Operations & Maintenance
Provide engineers with a new approach for directly measuring grit settling-velocity with a column. Learn how this may replace current design practices to use a sieve analysis and sand-equivalent size conversion to determine settling-velocity and in-turn evaluate existing removal efficiency performance, and the design, of new grit removal systems.
Level: Introduction to; limited knowledge of subject matter / entry level staff
Hany Gerges
National Director of Optimization
HDR
Walnut Creek
Amy Omae
Project Manager
HDR
Irvine, CA
Ulises Martinez
Engineer in Training
HDR
Sacramento, CA
Cindy Murra
Associate Engineer
Orange County Sanitation District
Fountain Valley, CA